Click to Home
Go To Search
Fairview Facebook PageFairview Twitter Page
Capital Improvement Program
Consolidated Stormwater Master Plan
  alt=
In 2007, the city adopted the Consolidated Stormwater Master Plan (CSMP), which analyzed problem areas within Fairview along with our National Pollutant Discharge Elimination System (NPDES) Stormwater Permit requirements and identified needed capital improvement projects (CIPs). The improvements are either required to reduce flooding, improve stormwater conveyance, and/or improve stormwater quality. These projects were ranked and prioritized and placed in the final CSMP along with maps and project cost sheets.